
Wall dehumidifier in a rented home: plan installation and monitoring
11/11/2026
Buzy Town Hall: a 30-metre ATG installation and renovation photographs
11/11/2026The Bardos Town Hall file records an installation on 7 February 2013 and a follow-up on 18 November 2014. The geomagnetic installation is presented under the ATG designation: a wall-drying polarity inverter without electricity, with a documented coverage diameter of 40 metres. The follow-up report states that tests took place in the mayor’s presence.
Recorded measurements
The calcium carbide measurements are expressed in g/100. Corridor: 6.6 then 0.2; secretariat: 6.3 then 3.0; main room: 7.0 then 1.5; council chamber: 15.2 then 0.3.
All four values decreased between the two visits. Some sampling heights and depths differed. These are point-by-point results from the report, not an overall percentage of building drying.
Documented workmanship
The work certificate identifies treatment of rising damp using a geomagnetic process. It rates workmanship, compliance with deadlines and site management as “Très bien” (very good). The file therefore combines a certificate identifying the intervention with measurements documenting its follow-up.



