
Pinsaguel château: measured follow-up in a heritage building
18/11/2026
Lourenties Church: three walls monitored after installation
18/11/2026This Humidistop France case file brings together the observations available for one building. It is intended to help property owners prepare a project from dated records, the construction materials and the conditions of each sample.
The Estérençuby Church file records an installation on 9 February 2017. Its control tables are dated 19 December 2018. For professionals reviewing the case, the readings must be considered alongside the sampling and unit inconsistencies in the original document.
Measurements recorded in the report
| Sampling point | Initial record | Follow-up record |
|---|---|---|
| Left point 1 | 2 gr | 1.2 gr |
| Left point 2 | “greater than 14 gr” | 1.1 gr |
| Right point | “9.6 cm” | 0.7 gr |
The report contains inconsistent units and sampling heights. Quoted initial entries are transcriptions, not confirmation that their units are correct. The first point was not sampled at the same height at both visits. These data do not support one comparable reduction calculation across all the points.
How to interpret the follow-up
The report concerning a GEOSTOP 60 states that the walls and floors were dry at the visit. This is the conclusion of that specific site report, not a guarantee of the result in another building. Preserve that attribution when presenting the reference to a customer.
Preparing the next steps for your building
Before selecting equipment, locate the affected walls on a plan and separate rising damp from rainwater entry, plumbing leaks and condensation. Keep dated photographs and note any changes to gutters, drainage, ventilation or wall finishes. These details matter when discussing coverage and placement.
What can this reference establish?
The figures describe the sampled points and the visits stated in the document. They do not establish a uniform condition throughout a building. Where locations or sample conditions changed, keep that limitation alongside the result. Finishing work should follow the actual condition of the substrate and any salts remaining in it.
How should equipment be compared?
Compare the exact technical reference, its coverage diameter, installation instructions and power requirements. ATE equipment is electromagnetic and uses electricity; ATG equipment is geomagnetic and operates without a mains connection. Keep the historical model in the report distinct from a model currently on sale. Address other water sources as part of the project.
Other Humidistop France references
Source: Humidistop site report supplied for this reference. Conclusions are attributed to that document; readings retain their original units and sampling limits.
Choose your Humidistop device
Is your problem caused by rising damp? Discover the ATE and ATG ranges made in France, with a 10-year manufacturer’s warranty under the terms of the product pages. Compare models, coverage and direct factory prices to choose the reference suited to your home.




